Facility Discipline Description of Work Category Status
Admin 100 Building (HS / Main) MEP Install occupancy sensors Energy Conservation  
Admin 100 Building (HS / Main) MEP Install TVSS (Transient Voltage Surge Protection) Preventive Maintenance  
Admin 100 Building (HS / Main) MEP Replace emergency lighting Capital  
Admin 100 Building (HS / Main) MEP Add battery back up system for basement pumps Capital  
Admin 100 Building (HS / Main) MEP Replace damaged condensate lines on roof Capital  
Admin 100 Building (HS / Main) MEP Install ground fault protected main electrical switch Capital  
Admin 100 Building (HS / Main) MEP Add EMS system Energy Conservation  
Admin 200 Building MEP Install occupancy sensors Energy Conservation  
Admin 200 Building Code Add compliant door hardware throughout Capital  
Admin 200 Building MEP Replace EMS system Energy Conservation  
Admin 200 Building MEP Install fire alarm system Life Safety  
Admin 200 Building MEP Install ground fault protected main electrical switch Capital  
Admin 200 Building Code Restrooms need complete renovation to meet ADA compliance capital  
Admin 200 Building MEP Update T12 lighting with T8 Energy Conservation  
Admin 300 Building (Board Rm) MEP Install occupancy sensors Energy Conservation  
Admin 300 Building (Board Rm) MEP Replace HVAC Supply and Return Grilles Capital  
Admin 300 Building (Board Rm) MEP Install additional electrical receptacles at media Capital  
Admin 300 Building (Board Rm) MEP Install TVSS Capital  
Admin 300 Building (Board Rm) MEP Replace  EMS system Energy Conservation  
Admin 300 Building (Board Rm) MEP Install fire alarm system Life Safety  
Admin 300 Building (Board Rm) MEP Update T12 lighting with T8 Energy Conservation  
Admin 300 Building (Board Rm) MEP Install ground fault protected main electrical switch Capital  
Admin 300 Building (Board Rm) MEP Update restroom plumbing & fixtures Capital  
Admin 400 Building (rock gym) MEP Support DX refrigerant lines to address corrosion Capital  
Admin 400 Building (rock gym) MEP Install occupancy sensors Energy Conservation  
Admin 400 Building (rock gym) MEP Replace EMS system  Energy Conservation  
Admin 400 Building (rock gym) MEP Install ground fault protected main electrical switch Capital  
Admin Annex Arch Paint interior Capital  
Admin Annex Arch Replace all lay-in ceiling Capital  
Admin Annex Arch Refinish restrooms Capital  
Admin Board Arch Refinish restrooms Capital  
Admin Complex Arch Install new handrails at steps to parking Capital  
Admin Complex Civil Asphalt Pavement Crack Sealing Preventive  
Admin Complex Arch Reseal exterior control joints, expansion joints, windows and utility openings Capital  
Admin Complex Civil 4-inch Concrete Sidewalk Repair Capital  
Admin Complex Arch Replace wood and hollow metal windows with aluminum windows Capital  
Admin Complex Arch Repair damaged masonry and foundation cracks Capital  
Admin Complex Arch Paint all previously painted exterior concrete wall panels and hollow metal doors frames and soffits Capital  
Admin Complex Arch Cover basement access to protect from water damage Capital  
Admin Complex Civil Asphalt Failure Repair (Full Depth Asphalt Repair, Includes Subgrade Repair) Capital  
Admin Complex Tech Switch Replacement/Upgrade Tech  
Rock Gym Struct Repair Stone Cracks Repair  

 

Admin 300 Building Progress Report

Back to Main Page