Facility Discipline Description of Work Category Status
Alt. Ed. Center MEP Provide additional electrical service Capital  
Alt. Ed. Center Arch Remove wood siding and replace with metal panels Capital  
Alt. Ed. Center Civil Asphalt Pavement Crack Sealing Preventive  
Alt. Ed. Center MEP Exhaust fan life cycle replacement Capital  
Alt. Ed. Center MEP Replace Library RTUs immediately Capital  
Alt. Ed. Center Code add compliant sink in clinic capital  
Alt. Ed. Center Food Add Hand Sink Capital  
Alt. Ed. Center Arch New Partitions for Gym Restrooms Capital  
Alt. Ed. Center Arch Replace hardware at front entry doors Capital  
Alt. Ed. Center Arch Remove wood ramp at west entry and replace with concrete Capital  
Alt. Ed. Center Code Add access path and compliant ramp in front parking lot Capital  
Alt. Ed. Center Code Provide accessible ramps at all required egress doors Capital  
Alt. Ed. Center Code Repair miscellaneous doors (fire doors and exterior doors) Capital  
Alt. Ed. Center Arch Remove existing window and replace with new aluminum window Capital  
Alt. Ed. Center MEP Gym - Remove gas unit heaters, extend gas to RTU Capital  
Alt. Ed. Center Arch Reseal exterior control joints, expansion joints, windows and utility openings Capital  
Alt. Ed. Center MEP Install Water heater at Nurses Office Capital  
Alt. Ed. Center Civil Concrete Failure Repair (Full Panel Replacement, No Subgrade Repair) Capital  
Alt. Ed. Center Civil 4-inch Concrete Sidewalk Repair Capital  
Alt. Ed. Center MEP Replace Water heater at Central Receiving Jan Capital  
Alt. Ed. Center MEP Update gym lighting, install T5 Energy Conservation  
Alt. Ed. Center MEP Add air conditioning to IDF rooms Capital  
Alt. Ed. Center Arch Misc. interior renovation and repair Capital  
Alt. Ed. Center Arch Replace Kitchen flooring w/ seamless Capital  
Alt. Ed. Center Code Multi user restrooms near rear center of building completely non compliant-full renovation capital  
Alt. Ed. Center Arch Replace all remaining 2x4 lay-in ceiling Capital  
Alt. Ed. Center MEP Replace electrical conduit on the roof (damage) Capital  
Alt. Ed. Center MEP Gym RTU replacement (with gas heat) Capital  
Alt. Ed. Center MEP Install ground fault protected main electrical switch Capital  
Alt. Ed. Center Code Add compliant door hardware capital  
Alt. Ed. Center MEP Replace collapsed kitchen sewer line Capital  
Alt. Ed. Center MEP Replace floor drains in ES kit Capital  
Alt. Ed. Center MEP Replace fire alarm system Capital  
Alt. Ed. Center MEP Electrical panels for technology upgrade Capital  
Alt. Ed. Center Arch Replace all rolled carpet Capital  
Alt. Ed. Center Civil Asphalt Failure Repair (Full Depth Asphalt Repair, Includes Subgrade Repair) Capital  
Alt. Ed. Center MEP Electrical panels life cycle replacement (Replace Federal Pacific Panels) Capital  
Alt. Ed. Center Tech Switch Replacement/Upgrade Capital  
Alternative Ed Struct Repair Brick Cracks Repair  