Coble Middle School

Back to Main Page

Facility Discipline Description of Work Category Status
James Coble Civil Concrete Joint Sealant Preventive  
James Coble Civil 6-inch Concrete Curb & Gutter (Remove & Replace) Capital  
James Coble Arch Repair damaged masonry at entry columns Capital  
James Coble Civil 4-inch Concrete Sidewalk Repair Capital  
James Coble MEP Sinks added to indoor and outdoor concessions bring to compliance with code Capital  
James Coble Civil Concrete Failure Repair (Full Panel Replacement, No Subgrade Repair) Capital  
James Coble MEP Sound system for Competition Gym Capital  
James Coble MEP Replace fire alarm system door hold open devices Life Safety  
James Coble Arch Re-surface track and event lanes Capital  
James Coble Kitchen MEP Replace kitchen HVAC diffusers and grilles (2011) Capital  

Back to Main Page