Shepard Intermediate School

Back to Main Page

Facility Discipline Description of Work Category Status
Donna Shepard Arch Remove sisal and replace with tile Capital  
Donna Shepard Civil Add sidewalk to Gertie Barrett Capital  
Donna Shepard MEP Change out concentric diffusers on 2nd floor Capital  
Donna Shepard MEP Add AC to electric room by gym (VERY hot) Capital  
Donna Shepard Arch Reseal exterior control joints, expansion joints, windows and utility openings Capital  
Donna Shepard Arch Add secured entrance w/ doorbell Capital  
Donna Shepard Civil Slope Protection/Erosion Control Measures Capital  
Donna Shepard MEP Replace electric water heaters (2011) Capital  
Donna Shepard MEP Add air conditioning to IDF rooms Capital  
Donna Shepard Arch Misc. interior renovations and repairs Capital  
Donna Shepard Arch Replace Kitchen flooring w/ seamless Capital  
Donna Shepard MEP Address condensate problems from SSHPs  Capital  
Donna Shepard Tech Wireless Capital  
Donna Shepard MEP Address sanitary sewer belly / backfall at kitchen Capital  
Donna Shepard Arch Replace all rolled carpet  Capital  
Donna Shepard MEP Replace kitchen HVAC diffusers and grilles (2011) Capital  

Back to Main Page